Carbon Dioxide Utilisation Network

Worldwide Events

May
16
Wed
2018
all-day CO2 Reuse Summit @ Zurich
CO2 Reuse Summit @ Zurich
May 16 – May 17 all-day
CO2 Reuse Summit @ Zurich
The CO2 Reuse Summit, taking place on 16-17 May 2018 in Zurich, will bring together major stakeholders from the industry to highlight latest developments related to carbon utilization. The programme will address challenges and opportunities when it[...]
Jul
9
Mon
2018
11:30 am CO2Chem Summer School @ The University of Sheffield
CO2Chem Summer School @ The University of Sheffield
Jul 9 @ 11:30 am – Jul 13 @ 1:00 pm
CO2Chem Summer School @ The University of Sheffield | Sheffield | England | United Kingdom
The inaugural CO2Chem Summer School delivers a four day masters level introduction to carbon dioxide utilisation.   Further Details               Registration        
Aug
27
Mon
2018
all-day The 16th International Conferenc... @ Rio de Janeiro
The 16th International Conferenc... @ Rio de Janeiro
Aug 27 – Aug 30 all-day
The 16th International Conference on Carbon Dioxide Utilization @ Rio de Janeiro | Brazil
In 2018, the 16th International Conference on Carbon Dioxide Utilization travels to Brazil. The overall theme is”Sustainability through CO2 Utilization” and there are six associated topics: Thermal and Catalytic Conversion of CO2 into Fuels and Chemicals; CO2 Conversion by[...]

BEIS invites tenders for the first phase of its £20 million CCU Demonstration programme

As part of the Government’s Clean Growth Strategy BEIS will be allocating up to £20 million to design and construct carbon capture and utilisation (CCU) demonstration projects. This programme will encourage industrial sites to capture carbon dioxide which could then be used in industrial applications. This would help to enable a pathway for learning and development of capture technologies at an intermediate scale, reducing the costs and risks. The programme will be run in three phases:

Phase 1 will be an initial scoping study for an engineering supplier to work on BEIS’ behalf with potential host sites, carbon dioxide users and technology suppliers to produce site-specific cost estimates for deploying CCU at UK industrial sites.

Phase 1 Invitation to Tender

Timeline: Questions Submission (15 Dec), Responses (22 Dec), Tender Submission (22 Jan), Award (12 Feb)

Phase 2 will fund design studies and phase 3 will fund projects to construct and demonstrate CCU.

Further Information

Twitter